North Deering, Portland farmhouse with a rebuilt deck by Cardinal Exteriors

Deck Building in Sebago, Maine

Deck Building for Sebago homes from a family-owned Portland company. An owner measures on site and writes a fixed-price proposal.

Deck Building for Sebago homes

A new deck in Sebago is usually about the lake or the hills. Shorefront lots on Sebago Lake and on Peabody, Hancock and Barker ponds fall within the shoreland zone, which covers land within 250 feet of a great pond, and the town keeps a separate shoreland zoning permit form. Setbacks from the water decide where a deck can go, so the site plan comes before the design. Hillside lots away from the water trade that constraint for grade, with views that open up only once the deck rises above the brush.

The ground makes its own demands. The town's history describes its surface as uneven and rocky, and ledge or boulders can stop a post hole short of the frost line, so footings sometimes have to move or be anchored to rock. Sloping lots toward the lake mean taller posts, longer stair runs and landings. Cardinal builds new decks in composite, PVC, pressure-treated lumber and cedar, with railings and stairs, and a new deck should go to the Code Enforcement Officer at 406 Bridgton Road for a building permit before work starts. Since the officer is often in the field midday, calling ahead saves a trip.

Sebago housing at a glance

Census estimates count about 1,520 housing units in Sebago, with a median year built of 1975, older than neighboring Naples. About 17 percent predate 1940 and roughly 36 percent predate 1960. Another 19 percent went up between 1960 and 1979, about a quarter between 1980 and 1999, and about 20 percent in 2000 or later. Some 85 percent are single-family detached houses, and about 89 percent of occupied homes are owner-occupied. Nearly 600 units are held for seasonal use. The town's 2006 comprehensive plan found that most homes along Sebago Lake, Peabody Pond and Barker Pond were seasonal while year-round houses sat away from the water, noted a steady conversion of camps to year-round use since 1991, and counted mobile homes at about 13 percent of the stock, mostly on individual lots rather than in parks.

Permits and design review in Sebago

Permits are handled by the Sebago Code Enforcement and Planning office at 406 Bridgton Road on Route 107, where the Code Enforcement Officer also serves as building inspector and is often out on site visits from noon to 3 p.m. The town's permits page lists building permits, shoreland zoning permits and permit-by-rule forms, and states that no permit is needed for roofing or exterior painting. Siding and window work should be confirmed with the office, and a new deck should be expected to need a building permit. Land within 250 feet of Sebago Lake or a great pond falls under shoreland zoning, which has its own permit form.

Weather and exposure in Sebago

Sebago is inland lake and hill country, so salt air is not a factor; snow and cold are. The National Weather Service station in nearby Gray records about 84 inches of snow in a normal year, with roughly 20 inches in each of January and February. Elevation adds to the exposure here: Sebago Center sits about 450 feet above sea level, and homes on the slopes toward Douglas Mountain sit higher still. Along the shore, Sebago Lake freezes over completely only every few winters, so wind has miles of open water to build across before it reaches the west-shore camps, and the lake area is known for sudden weather changes in every season. Wooded lots throughout town keep walls and decks shaded and slow to dry.

What new deck building involves

A new deck starts below ground. Footings have to reach below the frost line so the deck does not heave, the ledger that ties the deck to the house has to be flashed so it never rots the rim, and the framing has to carry snow as well as people. On top of that structure goes the part you see: composite and PVC boards, pressure-treated lumber or cedar, with railings, stairs and landings. Cardinal Exteriors builds new decks and full replacements only; it does not take on deck repairs or staining.

  • An owner visits, looks at the yard and the house, and talks through size, layout, stairs and material.
  • Permits are pulled where the town requires them.
  • Footings are dug or set below frost; posts, beams and joists are framed to span and load.
  • The ledger is flashed and fastened with structural fasteners, or the deck is built freestanding.
  • Decking, railings, stairs and landings go on, with hidden or face fasteners to suit the boards.

Signs it is time

  • You want outdoor living space where there is none
  • An existing deck is too small or poorly laid out for how you use it
  • A new door, addition or view calls for a deck to reach it

What affects the price of new deck building

  • Deck size, height and shape
  • Decking material: composite, PVC, pressure-treated or cedar
  • Railing style and stair runs
  • Footing type and site conditions: ledge, slope, access
  • Permits and any shoreland or setback requirements

Every job is priced from a free on-site visit. Typical ranges for the trade are on our deck building page, and the details of this service are on the new deck building overview.

Get a free new deck building estimate in Sebago

Tell us about the house and what you want changed. One of the owners will call to set up a visit, measure, and write a fixed-price proposal. No pressure, no obligation.

Need it today?Call Mike (207) 408-5388

or Bob at (207) 252-0759