North Deering, Portland farmhouse with AZEK composite decking by Cardinal Exteriors

Composite & PVC Decks in Yarmouth, Maine

Composite & PVC Decks for Yarmouth homes from a family-owned Portland company. An owner measures on site and writes a fixed-price proposal.

  • Google reviews
  • Fully licensed & insured
  • Free estimates
  • 20+ years combined experience

Composite & PVC Decks for Yarmouth homes

Composite and PVC boards make the most sense where Yarmouth's exposure is hardest on wood. On Cousins Island, Littlejohn Island and the Princes Point shore, salt air and sun split and gray a pressure-treated deck within a few seasons; capped composite holds its color and does not splinter underfoot. On wooded lots off Granite Street, Sligo Road and East Elm Street, shade keeps boards damp, and PVC in particular does not grow the mildew that makes wood slippery.

Low upkeep also matters for the roughly 120 Yarmouth homes the Census counts as seasonal. A composite deck on a summer cottage does not need staining every other year, and hidden fasteners leave a clean surface. Framing is still wood, so joist tape, proper spacing for drainage and footings below the town's 48-inch frost line matter just as much as the boards. Composite expands and contracts with temperature, so gapping and end-joint details should follow the manufacturer's cold-climate guidance. Railings in aluminum, composite or cable keep the view open on a water-facing deck.

Composite deck furnished as an outdoor living space backing onto woods

How a Deck Structure Is Built

  1. Footing — poured below Maine’s frost line so winter heaving cannot move it
  2. Post — carries the beam load down to the footing
  3. Beam — spans between posts and carries the outer ends of the joists
  4. Ledger — bolted to the house framing, with flashing that diverts water away from the wall
  5. Joists — span from the ledger to the beam, sized and spaced to the decking and the load
  6. Decking — the walking surface, fastened on top with spacing for drainage
New backyard deck built off the rear of a New England-style home

Yarmouth housing at a glance

The Census Bureau's 2020-2024 American Community Survey estimates about 3,600 homes in Yarmouth, with a median year built of 1973. Roughly 17 percent predate 1940 and about 27 percent predate 1960, while the biggest share, about 39 percent, went up between 1960 and 1979; only about 11 percent date from 2000 or later. About 80 percent of occupied homes are owner-occupied and about 76 percent are single-family detached, with roughly 120 units held for seasonal use. The town's 2024 comprehensive plan describes the village core as mostly mid-19th-century wood-frame single-family homes, Greek Revival first and Italianate second. After the 1955 causeway to Cousins and Littlejohn islands and the 1961 arrival of I-295, conventional subdivisions spread along North Road, East Elm Street, Bayview Street, Princes Point Road and Granite Street, with condominium clusters following in the 1980s.

Permits and design review in Yarmouth

Building permits go through the Yarmouth Code Enforcement Office at Town Hall, 200 Main Street. Chapter 301 requires a permit before any building or structure is erected, remodeled, demolished or relocated, and work started without one pays double the fee. The town notes that applications take about 30 days on average to review, and building permits must be mailed or dropped off rather than emailed. Inside the Upper Village, Lower Village and Royal River Manufacturing historic districts, all exterior changes go to the Historic Preservation Committee, whose review is mandatory but advisory. Shoreland permits apply near Casco Bay and the Royal River.

Weather and exposure in Yarmouth

Yarmouth's building code writes its design conditions straight into the ordinance: a ground snow load of 60 pounds per square foot, a design wind speed of 115 mph, weathering rated severe, a 48-inch frost line, a winter design temperature of minus 5 degrees and ice shield underlayment required. The town fronts Casco Bay along White's Cove and Broad Cove, so houses on Cousins Island, Littlejohn Island, Princes Point and the points along the shore take salt spray and open-water wind during nor'easters. Portland, the nearest long-term weather record, averages about 69 inches of snow a year. The comprehensive plan flags sea level rise along the shoreline, including stretches of the Talbot Road connector on the islands, and the town publishes flood and coastal bluff maps.

Yarmouth at a Glance

What the housing stock and local code enforcement mean for a siding, window, roofing or deck job here.

8,990

Population (ACS estimate)

Median year built: 1973

Homes built before 194017%

A mix of eras — original materials on some houses, postwar replacements on others.

State Building & Energy Code (MUBEC)

Enforced — population over 4,000

EPA Lead-Safe Rule (pre-1978 homes)

Applies to at least 27% of homes here

Shoreland Zoning

Applies near the water

Permits

Yarmouth Planning and Development / Building Permits & Codes

Codes & Permits for Composite Decks in Yarmouth

In Yarmouth, exterior-work permits come from the Yarmouth Planning and Development / Building Permits & Codes (200 Main Street, Yarmouth, ME 04096, 207-846-2401). With 8,990 residents, over 4,000, Yarmouth is required to enforce the Maine Uniform Building and Energy Code (MUBEC).

  • Maine's adopted 2021 IRC (R507.2.2) requires plastic composite deck boards, stair treads, guards, and handrails to comply with ASTM D7032, and (R507.2.2.1) to be labeled with the allowable load and maximum allowable span determined under ASTM D7032 — meaning composite span limits come from the product's own ASTM D7032 listing/manufacturer data rather than the standard wood joist-span tables, and are often shorter, requiring closer joist spacing than an equivalent wood board. up.codes
  • Composite decking installation must follow both the code and the manufacturer's instructions (R507.2.2.5), so a given product's specific fastening pattern and joist spacing should be pulled from its ICC-ES evaluation report or manufacturer install guide, not assumed from a generic wood-deck spec. up.codes
  • Maine's Shoreland Zoning Act creates a regulated shoreland zone extending 250 feet (horizontal distance) from the normal high-water line of any great pond, river, or coastal wetland, and 75 feet from certain streams; the Act's stated purposes include protecting buildings and land from flooding/erosion and controlling water pollution, and it governs deck and other structure setbacks and the expansion of nonconforming structures within that zone (specific setback/expansion rules are set at the municipal-ordinance level under the state's model guidelines). maine.gov
  • By Maine law (25 M.R.S. §2373), 'the code must be enforced in a municipality that has more than 4,000 residents' (per the most recent federal census); municipalities at or below that population are not required to adopt/enforce MUBEC but may opt in locally, per the state's own program page: 'All municipalities with a population greater than 4,000 are required, by statute, to enforce the MUBEC. Municipalities with a population under 4,000 may choose to enforce the MUBEC.' mainelegislature.org

How Cardinal Exteriors Handles Composite Decks in Yarmouth

  • Every ledger we attach for a composite and PVC decks job in Yarmouth is flashed to Maine's adopted deck code, with corrosion-resistant metal or an approved nonmetallic alternative, not a bare lag bolt into siding.
  • We set every Yarmouth deck's footings below frost depth and size them to the actual load, following Maine's adopted residential code rather than a rule of thumb.
  • Because Yarmouth has coastal, lake or river frontage, Maine's Mandatory Shoreland Zoning Act may apply to work close to the water, which can affect setbacks on a rebuild.
  • Yarmouth's population (8,990) puts it above the threshold where Maine law requires full MUBEC enforcement, so this job is inspected against that code as well as the local permit.
  • We file for composite and PVC decks permits at the Yarmouth Planning and Development / Building Permits & Codes before work starts, not after.
Yarmouth, ME
A home along Oakwood Drive in a residential neighborhood of Yarmouth.
Street View © Google

What composite and PVC decks involves

Composite and PVC decking do not need staining, do not splinter, and resist rot, which is why they have become the default for new decks in Maine. Composite boards blend wood fiber and plastic under a protective cap; PVC boards are all synthetic and lighter. The North Deering farmhouse on this site got a rebuilt deck with AZEK composite decking. The framing underneath is still wood, so it is built to last as long as the boards on top.

  • Layout, size and board color are chosen with the owner at the estimate visit.
  • Footings and framing are built to code, with joist spacing that suits the board manufacturer's span rules.
  • Joist tape or flashing protects the tops of joists and the ledger.
  • Boards go down with hidden fasteners or color-matched screws and the expansion gaps the product requires.
  • Matching railings, stair treads, fascia and landings finish the deck.

Signs it is time

  • You are done staining and sealing a wood deck every year or two
  • The deck is in shade or near water where wood stays damp
  • You want a deck that stays barefoot-friendly with no splinters

What affects the price of composite and PVC decks

  • Composite versus PVC, and the product line
  • Deck size, height and shape
  • Railing system and stairs
  • Hidden-fastener versus face-screw installation
  • Footing and framing conditions

Every job is priced from a free on-site visit. Typical ranges for the trade are on our deck building page, and the details of this service are on the composite and PVC decks overview.

For a deeper walkthrough of materials, code details and photos, see our full Composite & PVC Decks: What Changes From Pressure-Treated Lumber guide.

Get a free composite and PVC decks estimate in Yarmouth

Tell us about the house and what you want changed. One of the owners will call to set up a visit, measure, and write a fixed-price proposal. No pressure, no obligation.

Need it today?Call Mike (207) 408-5388

or Bob at (207) 252-0759