North Deering, Portland farmhouse with AZEK composite decking by Cardinal Exteriors

Composite & PVC Decks in Raymond, Maine

Composite & PVC Decks for Raymond homes from a family-owned Portland company. An owner measures on site and writes a fixed-price proposal.

  • Google reviews
  • Fully licensed & insured
  • Free estimates
  • 20+ years combined experience

Composite & PVC Decks for Raymond homes

Composite and PVC decking make sense for Raymond's many seasonal homes. A board that does not need yearly staining means owners can open camp in June and use the deck the same weekend. Lake and pond settings are damp and often shaded by tall pines, and wood decks there tend to grow mildew and turn slick. Capped composite and PVC boards resist that far better, though leaves and pollen still need rinsing off. Trex-style boards come in colors that suit a weathered camp or a newer lake house.

Winter is hard on any deck in Raymond. Freeze-thaw cycles and heavy snow sit on the surface for months, and shoveling with a steel blade can scar some boards, so a plastic shovel is kinder. Composite expands and contracts more than wood with temperature, so correct gapping and fastening matter in a climate with this kind of swing. Under the boards, the framing still needs to be sound, pressure-treated lumber on proper footings, because composite decking is only as good as what supports it. A deck close to the shore also falls under the town's shoreland review, so plan that into the timeline.

Composite deck furnished as an outdoor living space backing onto woods

How a Deck Structure Is Built

  1. Footing — poured below Maine’s frost line so winter heaving cannot move it
  2. Post — carries the beam load down to the footing
  3. Beam — spans between posts and carries the outer ends of the joists
  4. Ledger — bolted to the house framing, with flashing that diverts water away from the wall
  5. Joists — span from the ledger to the beam, sized and spaced to the decking and the load
  6. Decking — the walking surface, fastened on top with spacing for drainage
Aerial view of a new multi-level wood deck with a pergola and hot tub surround

Raymond housing at a glance

Census estimates put Raymond at about 3,050 housing units with a median year built of 1976. About 15 percent predate 1940 and roughly 31 percent predate 1960, while another 23 percent went up between 1960 and 1979 and about 22 percent date from 2000 or later. Around 94 percent are single-family detached houses, and roughly 90 percent of occupied homes are owner-occupied. The standout figure is seasonal use: about 1,010 units are held for seasonal or recreational occupancy, and the town comprehensive plan puts seasonal homes at over a third of the stock. That plan also notes the summer camps, cottages and lodges built along the lakes in the early and mid 20th century, older farmhouses at rural crossroads, and a wave of summer residents who began making Raymond their permanent home in the 1950s, which is why so many camps have been winterized and enlarged.

Permits and design review in Raymond

Permits run through the Raymond Code Enforcement Office at the town office on Webbs Mills Road, which uses an online permitting system and books meetings by appointment. The town building code page lists building a deck as work that needs a permit, and says residing, reroofing and same-size window replacement do not, as long as no structure or required egress is changed. Allow about 48 hours for processing. Raymond enforces the Maine Uniform Building and Energy Code, including the 2021 IRC. Work within 100 feet of the high water mark should start with a call to the Code Enforcement Officer, since shoreland rules, and sometimes a state DEP permit, apply.

Weather and exposure in Raymond

Raymond is inland lake country, not coast, so salt spray is not the issue. Snow and cold are. The National Weather Service forecast office sits in neighboring Gray, and its 1991-2020 normals show about 84 inches of snow a year, well above the roughly 69 inches recorded at the Portland Jetport. Much of that arrives from December through March, with repeated thaws and refreezes in between. Houses on the shore of Sebago Lake take the wind that builds across miles of open water, and because Sebago does not reliably freeze over, that open water stays exposed deep into winter. Wooded lots elsewhere in town stay damp and shaded, so north walls, roof valleys and deck boards are slow to dry after rain or melt.

Raymond at a Glance

What the housing stock and local code enforcement mean for a siding, window, roofing or deck job here.

4,605

Population (ACS estimate)

Median year built: 1976

Homes built before 194015%

A mix of eras — original materials on some houses, postwar replacements on others.

State Building & Energy Code (MUBEC)

Enforced — population over 4,000

EPA Lead-Safe Rule (pre-1978 homes)

Applies to at least 31% of homes here

Shoreland Zoning

Applies near the water

Permits

Town of Raymond Code Enforcement Office

Codes & Permits for Composite Decks in Raymond

In Raymond, exterior-work permits come from the Town of Raymond Code Enforcement Office. With 4,605 residents, over 4,000, Raymond is required to enforce the Maine Uniform Building and Energy Code (MUBEC).

  • Maine's adopted 2021 IRC (R507.2.2) requires plastic composite deck boards, stair treads, guards, and handrails to comply with ASTM D7032, and (R507.2.2.1) to be labeled with the allowable load and maximum allowable span determined under ASTM D7032 — meaning composite span limits come from the product's own ASTM D7032 listing/manufacturer data rather than the standard wood joist-span tables, and are often shorter, requiring closer joist spacing than an equivalent wood board. up.codes
  • Composite decking installation must follow both the code and the manufacturer's instructions (R507.2.2.5), so a given product's specific fastening pattern and joist spacing should be pulled from its ICC-ES evaluation report or manufacturer install guide, not assumed from a generic wood-deck spec. up.codes
  • Maine's Shoreland Zoning Act creates a regulated shoreland zone extending 250 feet (horizontal distance) from the normal high-water line of any great pond, river, or coastal wetland, and 75 feet from certain streams; the Act's stated purposes include protecting buildings and land from flooding/erosion and controlling water pollution, and it governs deck and other structure setbacks and the expansion of nonconforming structures within that zone (specific setback/expansion rules are set at the municipal-ordinance level under the state's model guidelines). maine.gov
  • By Maine law (25 M.R.S. §2373), 'the code must be enforced in a municipality that has more than 4,000 residents' (per the most recent federal census); municipalities at or below that population are not required to adopt/enforce MUBEC but may opt in locally, per the state's own program page: 'All municipalities with a population greater than 4,000 are required, by statute, to enforce the MUBEC. Municipalities with a population under 4,000 may choose to enforce the MUBEC.' mainelegislature.org

How Cardinal Exteriors Handles Composite Decks in Raymond

  • Maine's adopted deck code (R507.2.4) requires a corrosion-resistant ledger flashing at least 0.019 inch thick, or an approved nonmetallic equivalent — every ledger-attached deck we build in Raymond gets it.
  • We set every Raymond deck's footings below frost depth and size them to the actual load, following Maine's adopted residential code rather than a rule of thumb.
  • Because Raymond has coastal, lake or river frontage, Maine's Mandatory Shoreland Zoning Act may apply to work close to the water, which can affect setbacks on a rebuild.
  • Raymond's population (4,605) puts it above the threshold where Maine law requires full MUBEC enforcement, so this job is inspected against that code as well as the local permit.
  • We file for composite and PVC decks permits at the Town of Raymond Code Enforcement Office before work starts, not after.
Raymond, ME
A wooded stretch of Raymond Cape Road on the Raymond Cape peninsula in Raymond, on Sebago Lake.
Street View © Google

What composite and PVC decks involves

Composite and PVC decking do not need staining, do not splinter, and resist rot, which is why they have become the default for new decks in Maine. Composite boards blend wood fiber and plastic under a protective cap; PVC boards are all synthetic and lighter. The North Deering farmhouse on this site got a rebuilt deck with AZEK composite decking. The framing underneath is still wood, so it is built to last as long as the boards on top.

  • Layout, size and board color are chosen with the owner at the estimate visit.
  • Footings and framing are built to code, with joist spacing that suits the board manufacturer's span rules.
  • Joist tape or flashing protects the tops of joists and the ledger.
  • Boards go down with hidden fasteners or color-matched screws and the expansion gaps the product requires.
  • Matching railings, stair treads, fascia and landings finish the deck.

Signs it is time

  • You are done staining and sealing a wood deck every year or two
  • The deck is in shade or near water where wood stays damp
  • You want a deck that stays barefoot-friendly with no splinters

What affects the price of composite and PVC decks

  • Composite versus PVC, and the product line
  • Deck size, height and shape
  • Railing system and stairs
  • Hidden-fastener versus face-screw installation
  • Footing and framing conditions

Every job is priced from a free on-site visit. Typical ranges for the trade are on our deck building page, and the details of this service are on the composite and PVC decks overview.

For a deeper walkthrough of materials, code details and photos, see our full Composite & PVC Decks: What Changes From Pressure-Treated Lumber guide.

Get a free composite and PVC decks estimate in Raymond

Tell us about the house and what you want changed. One of the owners will call to set up a visit, measure, and write a fixed-price proposal. No pressure, no obligation.

Need it today?Call Mike (207) 408-5388

or Bob at (207) 252-0759