Deck Building for Portland homes from a family-owned Portland company. An owner measures on site and writes a fixed-price proposal.

  • Google reviews
  • Fully licensed & insured
  • Free estimates
  • 20+ years combined experience

Deck Building for Portland homes

New decks in Portland are shaped by small lots. Peninsula houses often have a narrow back yard, a triple-decker may want stacked porches or decks on each floor, and setbacks from lot lines can decide how big a deck can be. Out in Deering and North Deering, lots are larger and a ground-level deck off the kitchen is more common. On the islands, a deck facing the bay is often the whole point of the house.

Any new deck needs a building permit from Permitting and Inspections, and in a local historic district a deck visible from the street may also need preservation review. The structure has to rest on footings set below frost depth, attach to the house with a flashed ledger or stand on its own, and meet current guard, stair and landing rules. On waterfront and island lots, shoreland zoning can limit how close to the water a deck may be built. Cardinal builds new decks in composite, PVC, pressure-treated lumber and cedar, with railings, stairs and landings, and an owner draws up a fixed-price proposal after measuring the site.

Aerial view of a new multi-level wood deck with a pergola and hot tub surround

How a Deck Structure Is Built

  1. Footing — poured below Maine’s frost line so winter heaving cannot move it
  2. Post — carries the beam load down to the footing
  3. Beam — spans between posts and carries the outer ends of the joists
  4. Ledger — bolted to the house framing, with flashing that diverts water away from the wall
  5. Joists — span from the ledger to the beam, sized and spaced to the decking and the load
  6. Decking — the walking surface, fastened on top with spacing for drainage
Composite decking with matching composite railing

Portland housing at a glance

Portland has roughly 36,600 housing units, and the American Community Survey estimates a median year built of 1946. About 46 percent predate 1940 and about 61 percent predate 1960, while only about 16 percent date from 1960 to 1979 and about 11 percent from 2000 or later. Owners occupy about 47 percent of occupied homes, and single-family detached houses make up only about 36 percent of the stock, so multi-unit buildings are the norm rather than the exception. After the Great Fire of 1866 the peninsula was rebuilt largely in Victorian and Italianate styles, and wood-framed triple-deckers fill much of the older residential grid. Off the peninsula, Deering and the outer neighborhoods run to capes, colonials and mid-century houses. The census also counts nearly 1,900 seasonal units, many of them island cottages in Casco Bay.

Permits and design review in Portland

Building permits in Portland go through the city's Permitting and Inspections Department, which handles permits, licensing and inspections in one office. A new deck is structural work and needs a building permit; ask the department whether a given roof, siding or window job needs one before work starts. Portland also has a strong historic preservation ordinance. Properties in local districts including the West End, India Street, Congress Street, Deering Street, Stroudwater and the Old Port waterfront need a certificate of appropriateness for exterior alterations, reviewed by preservation staff or the Historic Preservation Board. Waterfront and island lots may also fall under shoreland zoning.

Weather and exposure in Portland

Portland sits on a peninsula in Casco Bay, and exposure changes block to block. Houses on the eastern and western ends of the peninsula, along the harbor and on the islands take wind straight off the water, while inland neighborhoods such as Deering and Stroudwater are more sheltered. Snowfall averages about 69 inches a year, but the city has seen seasons as light as 30 inches and as heavy as 150. Severe nor'easters arrive in winter with wind-driven rain and snow that finds any gap in old clapboard, trim or window casing. Repeated freeze and thaw works on paint, caulk and shingles, and salt air on the waterfront and islands speeds corrosion of fasteners, flashing and exposed metal.

Portland at a Glance

What the housing stock and local code enforcement mean for a siding, window, roofing or deck job here.

68,408

Population (ACS estimate)

Median year built: 1945

Homes built before 194047%

Original wood clapboard or shingle siding, wood-sash windows and multi-layered roofs are common here.

State Building & Energy Code (MUBEC)

Enforced — population over 4,000

EPA Lead-Safe Rule (pre-1978 homes)

Applies to at least 60% of homes here

Historic District

Exterior work may need design review

Shoreland Zoning

Applies near the water

Permits

Permitting and Inspections Department, City of Portland

Codes & Permits for Deck Builder in Portland

In Portland, exterior-work permits come from the Permitting and Inspections Department, City of Portland (389 Congress St, Room 315, Portland, ME 04101, 207-874-8703). With 68,408 residents, over 4,000, Portland is required to enforce the Maine Uniform Building and Energy Code (MUBEC). The West End, India Street, Congress Street, Deering Street and Stroudwater local historic districts require a certificate of appropriateness for exterior alterations, reviewed by the Historic Preservation Board.

  • Maine's adopted 2021 IRC (R507.2.4) requires deck ledger/flashing to be corrosion-resistant metal at least 0.019 inch thick, or an approved nonmetallic material compatible with both the house's substrate and the decking material. up.codes
  • Deck footing size is based on tributary area and soil-bearing pressure per Table R507.3.1, but the actual frost-line depth used to set footing depth is filled in locally by each Maine jurisdiction (per Table R301.2's instruction that 'the jurisdiction shall fill in the frost line depth column'), so contractors must confirm the specific required footing depth with each town's code office rather than assume one statewide number. up.codes
  • Metal fasteners and connectors for all decks must comply with Section R317.3 (corrosion protection for preservative-treated wood) and Table R507.2.3. up.codes
  • Maine's Shoreland Zoning Act creates a regulated shoreland zone extending 250 feet (horizontal distance) from the normal high-water line of any great pond, river, or coastal wetland, and 75 feet from certain streams; the Act's stated purposes include protecting buildings and land from flooding/erosion and controlling water pollution, and it governs deck and other structure setbacks and the expansion of nonconforming structures within that zone (specific setback/expansion rules are set at the municipal-ordinance level under the state's model guidelines). maine.gov

How Cardinal Exteriors Handles Deck Builder in Portland

  • Every ledger we attach for a deck building job in Portland is flashed to Maine's adopted deck code, with corrosion-resistant metal or an approved nonmetallic alternative, not a bare lag bolt into siding.
  • We set every Portland deck's footings below frost depth and size them to the actual load, following Maine's adopted residential code rather than a rule of thumb.
  • Portland's shoreline, lake or river frontage falls under Maine's Mandatory Shoreland Zoning Act, so we check setback rules before work starts near the water.
  • With 68,408 residents, Portland is over Maine's 4,000-resident line, so the town enforces the statewide Uniform Building and Energy Code (MUBEC) on top of its own permit process.
  • We file for deck building permits at the Permitting and Inspections Department, City of Portland before work starts, not after.
Portland, ME
A Victorian home on Neal Street in Portland's Western Promenade Historic District, developed in the late 1800s with Second Empire, Italianate, Queen Anne and Shingle-style houses.
Street View © Google

What new deck building involves

A new deck starts below ground. Footings have to reach below the frost line so the deck does not heave, the ledger that ties the deck to the house has to be flashed so it never rots the rim, and the framing has to carry snow as well as people. On top of that structure goes the part you see: composite and PVC boards, pressure-treated lumber or cedar, with railings, stairs and landings. Cardinal Exteriors builds new decks and full replacements only; it does not take on deck repairs or staining.

  • An owner visits, looks at the yard and the house, and talks through size, layout, stairs and material.
  • Permits are pulled where the town requires them.
  • Footings are dug or set below frost; posts, beams and joists are framed to span and load.
  • The ledger is flashed and fastened with structural fasteners, or the deck is built freestanding.
  • Decking, railings, stairs and landings go on, with hidden or face fasteners to suit the boards.

Signs it is time

  • You want outdoor living space where there is none
  • An existing deck is too small or poorly laid out for how you use it
  • A new door, addition or view calls for a deck to reach it

What affects the price of new deck building

  • Deck size, height and shape
  • Decking material: composite, PVC, pressure-treated or cedar
  • Railing style and stair runs
  • Footing type and site conditions: ledge, slope, access
  • Permits and any shoreland or setback requirements

Every job is priced from a free on-site visit. Typical ranges for the trade are on our deck building page, and the details of this service are on the new deck building overview.

For a deeper walkthrough of materials, code details and photos, see our full Deck Building in Maine: Frost-Depth Footings and Ledger Flashing guide.

Get a free new deck building estimate in Portland

Tell us about the house and what you want changed. One of the owners will call to set up a visit, measure, and write a fixed-price proposal. No pressure, no obligation.

Need it today?Call Mike (207) 408-5388

or Bob at (207) 252-0759